                          Residential Fee Schedule                     

                                            Plan Review                            Accessory Structures

                                            Electrical                                 Plumbing

                                            Mechanical                              Miscellaneous

                           Commercial and Industrial Fee Schedule                     

                                            Plan Review                               Electrical

                                            Plumbing                                    Mechanical

                                            Cell Towers

        Miscellaneous Fee Schedule

                                   Construction Trailer                    Sales Trailer

                                            Fuel Storage Tanks                    Water Storage Tanks

                                            Swimming Pools                         Elevators

                                            Signs                                          Fire Alarms

                                            Demolition                                  Amusement Devices

                                            Post Construction Fee                 Appeals

                                            Courtesy Inspection

          Additional Permit and Fee Information

                                             State Levy                                 Reinspection Fee

                                             Refunds                                     Suspension of Permit

                                             Cancellation of Permit                           

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Adopted June 12, 2012

 

Building Department Fees

 

 

 

 

 

Fees

§ 29-1.

Fee Schedule

 

A.

 

Caroline County building, electrical, mechanical and plumbing permit applicationfees shall be as follows:

 

 

 

 

 

1.

 

Residential Fee Schedule and Permits

 

 

 

 

 

 

(a)

Plan Review Deposits

 

 

 

[1]

Plan Review Deposit, for a single family dwelling, Modular, Double-wide manufactured home, and single-wide manufactured home, of $200.00 shall be payable when application is submitted, which will be credited to the total cost calculated for the permits.  Deposits shall not be refundable if the permits are not picked up within 90 days after approval.

200.00

 

 

 

 

 

[2]

Plan review deposit for accessory structures, payable when application is submitted, which will be credited to the total cost calculated for the permits.  Deposits shall not be refundable if the permits are not picked up within 90 days after approval.

100.00

 

 

 

(b)

 

Plan Review fees as follows:

 

 

 

[1]

Residential Dwelling Units, Additions, Alterations, Manufactured Homes, and Industrialized Homes (modular)

 

 

 

(a)     Per Square Foot - 1st Floor

.15

 

 

(b)     Per Square Foot - 2nd Floor, finished basement

.15

 

 

(c)     Per Square Foot - Unfinished Basement, Attached Garage, or Other Unfinished Area

.15

 TOP

 

(d)     Minimum Permit

100.00

 

 

(e)     Revisions to building plans previously approved.

75.00

 

 

[2]

 

Accessory Structures

(Storage sheds over 200 sq. ft., Detached Garages, Workshops, underground structures, etc.)

 

 

 

 

(a)     Per Square Foot

.12

 

 

(b)     Minimum Permit

100.00

  TOP

 

[3]

 

Electrical

 

 

 

 

Per Dwelling Unit

 

 

 

(a) 200 amp or less

75.00

 

 

(b) More than 200 amp

150.00

 

 

(c) Over 5,000 sq. ft.

.015/sq. ft.

 

 

(d) Per Addition, Alteration, Garage or Accessory Structure

50.00

 

 

(e) Per Service Upgrade or Change

75.00

 

 

(f) Manufactured Home

50.00

       

  TOP

[4]

Plumbing

 

 

 

 

(a)     Per Dwelling Unit (up to 5,000 square feet)

75.00

 

 

(b)     Over 5,000 square feet)

.015/sq.ft

 

 

(c)     Per Addition, Alteration, Garage or Accessory Structure

50.00

 

 

(d)     Manufactured Home

50.00

  TOP

 

 

[5]

 

 

Mechanical

 

 

 

 

(a)     Per Dwelling Unit  Up to 5,000 square feet

75.00

 

 

(b)     Over 5,000 square feet

0.15/sq.ft

 

 

(c)     Per Addition, Alteration, Garage or Accessory Structure

50.00

 

 

(d)     Manufactured Home

50.00

 

 

(e)     Fire Suppression System 0 - 2,000 square feet

45.00

 

 

(f)      Fire Suppression System - Over 2,000 Square feet

55.00

 

 

(g)     Change out or Replacement of Gas Furnace, Boiler, gas logs, or Fireplace

 

50.00

  TOP

[6]

Miscellaneous

 

 

 

 

(a)     Replace Roof or Siding (not required but upon request)

35.00

 

 

(b)     Brick Veneer

35.00

 

 

(c)     Deck - up to 400 sq.ft.

100.00

 

 

(d)     Deck - over 400 sq.ft.

..25 sq. ft.

 

 

(e)     Chimney

40.00

 

 

(f)      Fireplace

60.00

 

 

(g)     Docks

50.00

 

 

(h)     Stoops /Porch

50.00

 

 

(i)       Fence over 6 feet tall

50.00

 

 

(j)     Generator

100.00

 

 

(k)    Hot Tub

100.00

 

 

(j)    Replace Water/Sewer Line

50.00

 

2.

 

 

Commercial and Industrial Fee Schedule

 

 

 

 

(a)

Plan Review Deposits

 

 

[1]

Plan Review Deposit, for Commercial buildings under 5,000 square feet,, shall be payable when application is submitted, which will be credited to the total cost calculated for the permits.  Deposits shall not be refundable if the permits are not picked up within 90 days after approval.  Minor Alterations will require $100.00 deposit.

 

500.00

 

[2]

Plan Review Deposit, for a commercial building, 5,000 square feet or larger, shall be payable when application is submitted, which will be credit to the total cost calculated for the permits.  Deposits shall not be refundable if the permits are not picked up within 90 days after approval.  Minor Alterations will require $100.00 deposit.

 

750.00

 

[3]

Third party plan review fee will be charged at:

 

 

75.00/hr.

 

(b)

Plan Review Fees are as follows:

 

 

 

[1]

New Construction

 

 

 

 

(a)     Plan Review Under 5,000 square feet

225.00

 

 

(b)     Plan Review Over 5,000 square feet

300.00

 

 

(c)     Per Square Foot - All Floor Area

.17

 

 

(d)       Amendments to building plan previously reviewed or approved

 

100.00

 TOP

[2]

Addition or Alteration

 

 

 

 

(a)     Plan Review Under 5,000 square feet

125.00

 

 

(b)     Plan Review Over 5,000 square feet

200.00

 

 

(c)     Per Square Foot – All Floor Area

.17

 

 

(d)     Review of revisions to building plan previously reviewed or approved.

 

75.00

 TOP

[3]

Electrical

 

 

 

 

(a)     Per Service - 200 Amps or Less

125.00

 

 

(b)     Per Service - More than 200 Amps

200.00 Min.

 

 

 

(50.00 per 100 amps)

 

 

(c)     Per Square Foot of Floor Area

.015/sq.ft.

 

 

(d)     Minimum Permit

125.00

  TOP

 

[4]

 

Plumbing

 

 

 

(a)     0 up to 7,499 square feet

125.00

 

 

(b)     7,500  square feet or greater

.015/sq.ft.

  TOP

[5]

Mechanical

 

 

 

 

(a)     0 –- 4,000 Square Feet

150.00

 

 

(b)     4,001 - 20,000 Square Feet

250.00

 

 

(c)     Plan review for over 20,000 square feet

325.00

 

 

Plus

0.15/sq.ft.

  TOP

[6]

Fire Suppression System

 

 

 

 

(a)     Sprinkler New Construction

2.50/head; 300.00 min.

 

 

(b)     Sprinkler Alteration

2.50/head; 100.00 min.

 

 

(c)     Sprinkler Limted Area

200.00

 

 

(d)     Type 1 & 2 Hoods

100.00/hood

 

 

(e)     Fire Dampers

15.00/damper; 600.00 min.

 

 

(f)      Fire Suppression for Hood

 

100.00

 

 

(g)      Reinspection or Retest of Sprinkler Flow Test

 

100.00

 TOP 

[6]

Cell Towers (Building, Electric & Plan Review)

 

 

 

 

 

(a)     New Construction (Single Tenant)

1,850.00

 

 

 

(b)     Co-location

 

1,350.00

 

3.

 

Miscellaneous Fee Schedule

 

 

 

 

(a)

Miscellaneous fees as follows:

 

 

 

 TOP

 

[1]

Construction Trailer (includes all fees)

250.00

 

  TOP

 

[2]

Sales Trailer (includes all fees)

350.00

 

  TOP

[3]

Fuel Storage Tanks

 

 

 

 

(a)     Up to 50,000 Gallons - Total Per Site

125.00

 

 

 

(b)     Over 50,000 Gallons - Total Per Site

275.00

 

 

 

(c)     Fuel Tank Removal - In-ground

150.00

 

 

 

(d)   Fuel Tank Removal - Above Ground

100.00

 

  TOP

 

 

[4]

 

Water Storage Tanks

100.00

 

  TOP

 

[5]

 

Swimming Pools (Includes Electrical & Mechanical Fees)

 

 

 

 

(a)     Above Ground - Residential

100.00

 

 

 

(b)     In Ground - Residential

250.00

 

 

 

(c)     Public

 

350.00

 

  TOP

[6]

Elevators

 

 

 

 

(a)     Per Floor & Minimum Electrical

75.00

 

          TOP
 

 

 

[7]

 

Signs

 

 

 

 

(a)     Per Sign - Non-Illuminated

35.00

 

 

 

(b)     Per Sign - Illuminated

100.00

 

 

 

(c)     Per Sign More than 20 feet Above Grade

75.00

 

  TOP

 

[8]

 

Fire Alarms

 

 

 

 

 

100.00

 

 

 

 

Plus $10.00 Per Device

 

  TOP

 

[9]

 

Demolition - per permit

 

30.00

 

  TOP

 

[10]

 

Amusement Devices

 

 

 

 

(a)     Per Kiddie Ride

15.00

 

 

 

(b)     Per Major Ride

35.00

 

 

 

(c)     Per Spectacular Ride

55.00

 

  TOP

 

[11]

 

Commercial Re-Roof

 

150.00

 

  TOP

 

[12]

 

Generator Commercial

 

150.00

 

          TOP

 

[13]

 

Tents

 

100.00

 

 

 

   Tents w/Electric

150.00

 

          TOP

 

*

 

Building Official reserves the right to assign fees for items not shown

 

 

                                                                                                                                                                                                                          

 

 

 

 

4.

 

ADMINISTRATIVE FEES

 

 

 

 

 

 

 

(a)    Fast Trac Plan Review

.04/sq ft per copy

 

 

(b)     Plan Review for Lost Plans

50.00.

 

 

(c)     Modification of Code (Inspection only)

50.00

 TOP

 

(d)     Modification to the Code - Certificate issued by Building Official

50.00

 

 

(e)     Stop Work Order/Notice of Violation

200.00

 

 

(f)     Building Change of Use/Occupancy Load

50.00

 

 

(g)     C/O Existing Building

25.00

 

 

(h)     Evaluation of Existing Structure

100.00

 

 

(i)     Appeal to Local Building Code Board of Appeals

250.00

 

 

(j)     Post Construction Permit Fee (construction without permit)

Twice the amount of the permit fee or $250.00 - whichever is greater

  

 

 

 

 

 

§36-137

R2% State Levy Shall be applied to all Fees.

 

§ 29-2.

Reinspection Fee

 

 TOP      

 

A reinspection fee of $100.00 will be charged for each failed inspection.  This reinspection fee shall be paid within thirty (30) days of the invoice date.  Failure to pay within the thirty (30) day billing period shall result in the suspension of all inspections until all reinspection fees that are due, are paid in full.  No final inspection for the certificate of occupancy will be scheduled until all reinspection fees are paid in full to the Department of Inspections.

 

 

 

 

§ 29-3.

Refunds

 

 

 

  TOP

When a permit is returned or becomes void due to inactivity or abandonment, the permit holder may return the permit along with a written request for a refund within six (6) months.  A refund will be issued subject to the following:

 

 

 

 

 

  1. The refund will be pro-rated according to the number of inspections completed.

 

  1. A plan review and processing fee of 20% or $200.00, whichever is greater, for single family dwelling, modular, double-wide manufactured or single-wide manufactured home, will be deducted from the original permit fee.

 

  1. A plan review and processing fee of 20% or $100.00, whichever is greater, for all accessory structures, will be deducted from the original permit fee.

 

  1. A plan review and processing fee of 20% or $500.00, whichever is greater, for commercial structures under 5,000 sq. ft., will be deducted from the original permit fee.

 

  1. A plan review and processing fee of 20% or $750.00, whichever is greater, for commercial structures 5,000 sq. ft. or larger, will be deducted from the original permit fee.

 

 

§ 29-4.

Abandonment of Work

 

  TOP

Any permit shall become invalid if work on the site authorized by the permit is not commenced within six months after issuance of the permit, or if the authorized work on the site is suspended or abandoned for a period of six months after the time of commencing the work; however, permits issued for building equipment such as plumbing, electrical and mechanical work shall not become invalid if the building permit is still in effect.  It shall be the responsibility of the permit applicant to prove to the building official that work has not been suspended or abandoned.  Upon written request, the building official may grant one or more extension of time, not to exceed one year per extension. Permits that become invalid will be voided and the permit fee forfeited.  The permit can be reinstated one time within six (6) months of issuance for a $75.00 fee.

 

 

§ 29.5

Revocation of Permit

 

  TOP

Any permit that has been inactive for more than six (6) months shall be revoked and the permit fee forfeited.  A new permit shall be required prior to resumption of the project.











 

 

       Home  |   Sitemap  |  Contact Us